The following are Current Best Practice deadlines for each scheduling category:
- Daily schedule: 20 h before start of job
- Weekly schedule: 72 h before start of week.
- Shutdown: 1 weeks before start of shutdown if the shutdown is shorter than
16 hours.
- 4 weeks before start of shutdown if the shutdown is longer than 16 hours.