Smart Maintenance Method

March 2008

It is possible to change out splices in power lines while the line is energized.  The procedure also improves the reliability of the splice. A splice is usually pressed together using hydraulics while the line is down (see result in figure 1, left image). But a company names Quanta replaces and redesigns the splice using implosion to enhance the quality and replace the old splice on-the-run. The high quality result can be seen in figure 1 below. 

smart maintenance methods

See a newscast of the procedure : (8,5MB .wmv file)

See a clip of power line workers from Quanta: (4,8MB .wmv file)