Work Order Job Kits

Putting together Work Order Job Kits is more than just gathering the parts needed for a planned job.

The Kitting of parts and materials is a mission-critical component to the successful execution of any Planned job.

The “Job Kit” should also contain items that are required by the crafts as they execute the Job Plan. Some of those items are, and this is certainly not an exhaustive list:

  • bolts
  • nuts
  • thread locking compound
  • silicon
  • dye penetrant
  • last but not least…rags!

One of the objectives in fully preparing a Work Order Job Package is to include every tangible item that could possibly be needed in the “Kit” for the crafts to execute the assigned task to completion.   If the craft-persons feet have to leave the work area, something in the Planning of the job was missed.

Work Order Job Kit

Do you need help in how to effectively plan your work orders? Why not try our Self-Paced training in Work Management. Or give us a call to learn how to assess your process.

Contact us 

Read more articles about Planning and Scheduling

At IDCON, we understand the pressure you face trying to build a reliable plant.
We provide side-by-side reliability and maintenance consulting and training designed to keep your equipment running.

For over 45 years, we’ve partnered with 100s of manufacturing plants around the world to eliminate the costs and the pressure caused by unreliable equipment. And we’d love to do the same for you.

Contact us today to see how we can help you keep your plant running.

Related Articles

Terry Taylor

Terry Taylor

Want weekly Reliability & Maintenance Tips?

Weekly Tip Signup Form

Best practices. Common sense. Pratical tips.
All designed to help you and your team keep your plant running

IDCON © 2020 All rights reserved

8-step-checklist-preventive-maintenance-program-download
Free Download & Video

8 Steps to Successfully Implement Preventive Maintenance

Reduce your costs with an effective PM program