September 2007

Adjusting packed centrifugal pumps with open impellers

ok

Open impellers are frequently used in centrifugal pumps which pump liquids that contain suspended solid materials (slurries, paper stock, etc). They do not plug as easily as closed impellers and usually have a simple external adjustment to maintain the correct impeller clearance as internal parts wear.

The front, or suction side, of the vanes must be set with a close clearance against the suction wear plate to achieve high efficiency and good performance. As the impeller and suction plate wear, performance will deteriorate over time. Regular clearance checks and adjustments will maintain good performance.
However, as the impeller is adjusted toward the suction wear plate, the clearance behind the impeller increases. Most open impellers have small vanes on the non-pumping side, called "back pump-out vanes". These vanes act like another centrifugal pump and have the purpose of maintaining a low pressure at the stuffing box. Without these vanes, the stuffing box pressure would be close to the discharge pressure of the pump, which could result in contamination of the packing and low packing life.

So if reduced pump performance suggests that the impeller clearance be adjusted or if packing life is reduced, both the suction- and back-side clearances should be checked. If the back-side clearance exceeds the manufacturer's recommendation, then a thinner gasket should be installed between the pump volute and the stuffing box cover so that correct clearance can be achieved.

Just as the suction-side clearance must be maintained for good pumping performance, the back-side clearance must be maintained for long packing life.

Do you want to read more reliability tips??
Jan 2012 nfrared Thermography Essentials
Dec 2011 Spare Parts Kit Age
Sept 2010 Drill & Thrills
June 2010 Trouble finding parts in your Storeroom?
Feb 2010 Smart Method:   Nord-Lock Bolt Securing System
Sept 2009 The Root Cause isn’t that Important
March 2009 Scheduling – A Hot Potato?
Feb 2009 Preventive Maintenance for Instrumentation
Jan 2009 Do Maintenance Planners Actually Do Maintenance Planning?
June 2008 What is Reliability worth in $
March 2008 Smart Maintenance Method
Feb 2008 Maintenance Managers – Do you have a clear...
Jan 2008 What's a "Root cause"?
Dec 2007 Long-lasting change in maintenance?
Nov 2007 Setting Maintenance Priorities
Oct 2007 Maintenance Key Performance Indicators (KPI's)
Sept 2007 Adjusting packed centrifugal pumps with open impellers
July 2007 Defining "Maintenance costs"
June 2007 Using corrective maintenance work plans to ...
Feb 2007 Maintenance Management for Supervisors
Oct 2006 Reliability Centered Maintenance (RCM)
Sept 2006 What is the Core Knowledge in Root Cause Analysis?
Feb 2006 Maintenance Planner’s Checklist
Jan 2006 Digital cameras
Dec 2005 A Planner's tool kit
Nov 2005 Root Cause Problem Elimination. A tool for an elite ..
July 2005 Managing Maintenance
May 2005 Root Cause Analysis (RCA)
April 2005 Maintenance Planning
Jan 2005 Industrial Preventive Maintenance (PM)
Nov 2004 Root Cause Failure Analysis (RCFA) or Trouble....
Oct 2004 Spare Parts Management Indicators
Sept 2004 Reliability Management - Change
Aug 2004 Plant Maintenance - Deciding if Components ...
May 2004 Case study - Results of Condition Monitoring
March 2004 Basic Principle of Hydraulic Motor
Feb 2004 Philosophy: Maintenance work
Jan 2004: Philosophy: Planning & Scheduling
Dec 2003: Philosophy: Inspection Interval
Nov 2003: Definition: “Preventive Maintenance” (PM)
Oct 2003: Technique: Inspection
Sept 2003: Technique: The smart hook
Aug 2003: Technique: Benchmarking
July 2003: Technique - Vacuum pump
June 2003: Tools: Grease gun with cordless power and .....
May 2003: Technique: Dirt is bad for bearings
April 2003: Definition: Break-in jobs
March 2003: Technique: Steam Trap
Feb 2003: Technique: Hydraulic
Jan 2003: Philosophy: Planning & Scheduling
Dec 2002: Technique: Alignment
Nov 2002: Technique: Belts
Home  |    Company  |    Products  |    Resources  |    Bookstore  |   Events  |   Articles  |   Contact Us
Contact us on 1 (919) 847-8764 or info@idcon.com
www.linkedin.com www.facebook.com/idconinc www.facebook.com/idconinc www.twitter.com/idconinc view flash movie download broschure contact information maintenance management consultants, maintenance, reliability, maintenance management, planning